Thornton: pool beside a timber-clad house at dusk, overlooking the hills
Brighton: dark-tiled pool with a raised edge against a timber fence
Balwyn: pool in front of a white single-storey house
Dromana: infinity-edge pool looking out over the trees at sunset
Hawthorn: lit pool and spa beside a black two-storey house at dusk
Blairgowrie: round pool in a courtyard garden in front of a white house
Heidelberg: pool with a built-in daybed and bamboo screening
Thornton: raised concrete pool against a timber wall on a hillside
Aquacon Pools

Custom concrete pools, Melbourne

We build a small number of pools each year, and we are on site for every one of them, from the first quote to the day we hand it over.

Aquacon is a family business. For more than 25 years we have built concrete pools across Melbourne, working alongside some of the city’s leading architects and builders.

Our tradesmen have been with us for over a decade. We manage every trade on the project, so you deal with one person, start to finish.

Building since
Over 25 years
Pools a year
A select few
Working across
Melbourne and surrounds
About Us

Selected projects

Pools Gallery
Blairgowrie: round pool and spa set into a garden courtyard, from above
01Blairgowrie
Thornton: raised concrete pool and timber house in a hillside garden
02Thornton
Dromana: long infinity-edge pool on a timber deck above the bush
03Dromana
Heidelberg: pool lit blue at night beside a glass-walled living room
04Heidelberg
Brighton: dark-tiled pool with a raised edge beside the house
05Brighton
Hawthorn: lap pool and spa in front of a black two-storey house
06Hawthorn

How we work

From the first meeting on site to the day we hand it over, in five stages.

  1. 01

    Consultation

    We meet you on site to talk through the design, your budget and what you want from the pool. Then we prepare an obligation-free quote.

  2. 02

    Contract

    Once the design and quote are approved, we both sign a SPASA contract. It sets out what is included, what is not, and the payment terms.

  3. 03

    Permits

    Engineering and the building permit take about four to five weeks, or up to six months if a planning permit is needed. We line up the trades in that time.

  4. 04

    Construction

    We set out the pool on site and begin excavation. We allow at least ten weeks to build, including four weeks for the shell to cure before tiling.

  5. 05

    Handover

    We can also arrange the fencing, electrical, plumbing and landscaping, so the whole job runs through one contact until we hand it over.

FAQs

Enquire

Thinking about a pool? Start with a conversation.

Tell us about your site and what you have in mind, and we will arrange a time to meet you there.

Phone
0438 11 64 11
Email
info@aquaconpools.com.au
Enquire Here